Ruijie RG-S7800C Switches Quick Installation Guide, V1.2
2 Safety Precautions for Movement
RG-S7800C series switches are large and heavy. When you move them, please pay attention to the following requirements:
Unplug all power cords before you move the switch. Note: There may be more than one power cord.
Remove the power supply, fans and service modules to reduce the chassis weight before moving the switch for a long distance.
At least two people are needed to move the switch.
Grasp the handles on top side of the chassis, not the power supply handle, fan handle or the rear panel handle. Those handles
are just used to install and remove corresponding parts, and cannot bear the whole switch weight.
The whole switch weight may be greater than 70 kg during the movement.
Safety Precautions for Movement
Need help?
Do you have a question about the RG-S7800C Series and is the answer not in the manual?
Questions and answers