Checking The Safety Light Grid - Pilz PSEN op2H-SL Series Manual

Table of Contents

Advertisement

PSEN op2H-SL Series
PNOZmulti for safety light grid monitoring
}
Configure the safety light grid in the PNOZmulti Configurator with switch type 3.
Automation system PSS 4000 for monitoring safety light grids with the FS_LightCurtain
}
function block
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Connect the evaluation device according to the specifica-
tions in the selected evaluation device's operating manual.
Fig.: Dual-channel connection of the safety light grid on the input circuit of an evaluation device –
EDM deactivated, automatic restart

Checking the safety light grid

Once the safety light grid has been installed and aligned, final inspections must be carried
out before it can be put into service.
Operating Manual PSEN op2H-SL Series
1004304-EN-01
External supply voltage
24 V
Evaluation device
24 V
0 V
Input circuit
INFORMATION
This inspection may only be carried out by qualified personnel.
0 V
1
24 V
3
0 V
Restart Selection 2
4
OSSD 2
2
OSSD 1
5
EDM
Receiver
24 V
1
0 V
3
Restart
5
n.c.
4
Transmitter
36

Advertisement

Table of Contents
loading

Table of Contents