Fig. 137 Opening The *. Tnzip Archive; Fig. 138 Search Of The Existing Hw Configuration For The Ethercat Configuration Of The Example - Beckhoff EL3783 Documentation

Power monitoring oversampling terminal for 690 v
Table of Contents

Advertisement

Commissioning
* 737.2575 / 32768;
               
                EL3783_IL1_DC20[i] := INT_TO_LREAL(EL3783_IL1_DC_020[i])
* CF / 32768;
                EL3783_IL2_DC20[i] := INT_TO_LREAL(EL3783_IL2_DC_020[i])
* CF / 32768;
                EL3783_IL3_DC20[i] := INT_TO_LREAL(EL3783_IL3_DC_020[i])
* CF / 32768;
               
END_FOR
               „
Preparations for starting the sample programs (tnzip file / TwinCAT 3)
• Click on the download button to save the Zip archive locally on your hard disk, then unzip the *.tnzip
archive file in a temporary folder.
Fig. 137: Opening the *. tnzip archive
• Select the .tnzip file (sample program).
• A further selection window opens. Select the destination directory for storing the project.
• For a description of the general PLC commissioning procedure and starting the program please refer to
the terminal documentation or the EtherCAT system documentation.
• The EtherCAT device of the example should usually be declared your present system. After selection
of the EtherCAT device in the "Solutionexplorer" select the "Adapter" tab and click on "Search...":
Fig. 138: Search of the existing HW configuration for the EtherCAT configuration of the example
108
Version: 1.1
EL3783

Advertisement

Table of Contents
loading

Table of Contents