Operation
4 Operation
4.1 Configuration
Front view of the CU8810-0010 with opened enclosure
4.1.1 Opening the enclosure
The device is configured by a set of three switches. The switches are covered by an enclosure on the
upper right side on the front. To open the enclosure you need to remove the two screws, as shown below:
There are three DIP switches and two status LEDs covered by the plate. The detailed functions are
described in the following.
12
CU8810-0010