Utility:) Slope Submenu; Utility:) Lamp-Test Submenu - Comtech EF Data DT-4500 Series Installation And Operation Manual

C- and ku-band down converters
Table of Contents

Advertisement

DT-4500 Series C- and Ku-Band Down Converters
Front Panel Operation

6.2.7.6 (UTILITY:) SLOPE Submenu

Set your converter slope adjustment value. Use the   keys to select a digit,
and then use the  keys to change that digit. The default converter slope
adjustment is 0.0, with allowable values from 0.0 to 1.0. Press ENTER.

6.2.7.7 (UTILITY:) LAMP-TEST Submenu

Use the   keys to select No or press CLEAR to exit this submenu. Otherwise,
select Yes and press ENTER to continue. The test begins with this message:
The front panel runs through a series of diagnostics: the LED array cycles, and
then the VFD generate a series of test patterns.
The LEDs and VFD return to their previous display state upon successful
completion of the test. Once the test has run, press CLEAR to return to the main
menu.
Converter slope
adjustment = 0.0
Start Lamp Test?
No Yes
Lamp Test in Progress
Please Wait
6–27
MN/DT4500.IOM
Revision 2

Advertisement

Table of Contents
loading

Table of Contents