Switching On The Server; Handling The Cpu Node; Removing The Cpu Node - Fujitsu PRIMERGY GX2570 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

4.7

Switching on the server

CAUTION
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
For more information, see
▶ Press the On/Off button to start up the server.
▶ Ensure that the power-on indicator is lit green.
4.8

Handling the CPU node

4.8.1

Removing the CPU node

Figure 10: Loosening the screw
▶ Loosen the screw (see circle).
GX2570 M6
"Important information" on page
Upgrade and Maintenance Manual
Basic hardware procedures
25.
49

Advertisement

Table of Contents
loading

Table of Contents