4.7
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
For more information, see
▶ Press the On/Off button to start up the server.
▶ Ensure that the power-on indicator is lit green.
4.8
Handling the CPU node
4.8.1
Removing the CPU node
Figure 10: Loosening the screw
▶ Loosen the screw (see circle).
GX2570 M6
"Important information" on page
Upgrade and Maintenance Manual
Basic hardware procedures
25.
49