Operation Manual / A130-H.. - A140-H..
10
Disassembly and assembly
Installing the cartridge group
Figure 41
Attach the lifting gear to the suspension lug / eye of the cartridge group. For an oil-cooled
cartridge group, see detail a.
Lift the cartridge group out of the service support (90012).
Additionally, loop the lifting gear around the cartridge group as shown.
Looping the lifting gear around the cartridge group
The looped lifting gear can slip off and lead to serious injuries to persons or
even to fatal accidents.
WARNING
Make sure that the surface for the loop on the cartridge group and the
rope are free from oil.
Carefully lower the cartridge group into the turbine casing.
Secure fastening strips (51002) along with nuts (51007) and Verbusripp washers (51003).
(Table of tightening torques [➙ 103])
© Copyright 2013 ABB. All rights reserved.
HZTL2414_EN
Page 98 / 115
Revision B
March 2013