PARTS REQUIRED:
x2
x2
BEGIN
Orient parts AF on the fl at side, as shown.
1
Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge.
Place left panel on AF fl ush to installed gable panel and secure with 1-1/2" nails spaced 6" apart along edge.
2
Repeat STEP 2 for right panel.
Repeat STEPS 1 - 3 to build the 2nd gable unit.
FINISH
Your gable units are now installed.
GABLE UNITS
x4
AF
2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)
x2
Install gable panels with the primed side facing up.
3-1/2"
(8,9 cm)
AF
1-3/4"
(4,4 cm)
Flush
2-1/2"
Flush
(6,4 cm)
(15,2 cm)
AF
2-1/2"
(6,4 cm)
Flush
2" Nails
(5,1 cm)
Flush
2-1/2"
(6,4 cm)
Mark
27
x24
1-1/2" (3,8cm)
1-1/2" (3,8cm)
Nails
6"
6"