PARTS REQUIRED:
x13
1-1/2" (3,8 cm)
BEGIN
Remove temporary brace OO from
1
installed 10' gable wall.
Place 2nd 8' eave wall centered on fl oor
1-1/2" (3,8 cm) overlap is to the top.
ENSURE PANEL CORNERS ARE FLUSH.
Secure wall with (1) 2" screw through
2
gable wall panel into 10' wall bottom
and top plates (Fig. B, Fig. A).
Secure wall to bottom plate fi rst.
3
Nail lower edge of wall panels
to fl oor frame with 2" nails
spaced 6" apart.
Angle nails into fl oor frame
(Fig. C).
Secure wall bottom plates to fl oor
with 3" nails (Fig. C).
4
Nail 8' eave wall panel to 10' gable wall stud
with 1-1/2" nails spaced 6" apart.
5
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown (Fig. D).
FINISH
Your 2nd 8' eave wall is now installed.
8' EAVE WALL INSTALLATION
x2
2" (5,1 cm)
x18
2" (5,1 cm)
(15,2 cm)
2" (5,1 cm)
x8
x1
1-1/2"
(3,8 cm)
3" (7,6 cm)
Nails
6"
Nail 2" nails fi rst.
Nails
3" (7,6 cm)
Nails
Fig. C
2" (5,1 cm)
22
3" (7,6 cm)
3" (7,6 cm)
2" (5,1 cm)
Screw
Fig. A
Screw
3" (7,6 cm)
Screw
1-1/2" (3,8 cm)
Nails
Fig. B
Flush
Fig. D
6" (15,2 cm)