Download Print this page

Heartland VALUE Series Assembly Manual page 26

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2 JBD
2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm)
x2
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x2
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
BEGIN
1
Orient parts on top of wall frames. Measure and mark from end of boards.
Secure from top with (2) 3" nails spaced every 24" (Fig. A).
2
3
Secure from bottom with (2) 3" screws at each corner (Fig. B).
3" (7,6) cm
Nails
Fig. A
Fig. B
3" (7,6) cm
Screws
FINISH
Your wall doublers are now installed.
10' x 8' WALL DOUBLERS INSTALLATION
20-3/8"
(51,8 cm)
96"
(243,8 cm)
TJ
x48
x8
JBD
TJ
Ensure all doubler seams are
TP
Nail TYP.
24"
(61 cm)
92-5/8"
(235,3 cm)
DOOR
24
3" (7,6 cm)
3" (7,6 cm)
92-5/8"
(235,3 cm)
non-aligned over seams of
wall top plates.
TP
JBD
20-3/8"
(51,8 cm)
96"
(243,8 cm)

Advertisement

loading

Related Products for Heartland VALUE Series