Download Print this page

Heartland VALUE Series Assembly Manual page 23

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED
x18
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
BEGIN
1
Place 8' eave wall centered on fl oor.
1-1/2" (3,8 cm) overlap is to the top.
Secure wall with (1) 2" screw into 10' wall
bottom plate (Fig. A) and top plate (Fig. B).
Secure wall to bottom plate fi rst.
ENSURE PANEL CORNERS ARE FLUSH.
Nail lower edge of panels to fl oor with 2" nails
2
spaced 6" apart.
Angle nails into fl oor frame (Fig. C).
Nail panel to 10' wall stud with 1-1/2" nails
spaced 6" apart.
Secure wall top plate with (1) 3" screw
3
angled at the corner at an angle as shown
(Fig. D).
FINISH
Your 1st 8' eave wall is now installed.
8' EAVE WALL INSTALLATION
x1
3" (7,6 cm)
x8
1-1/2" (3,8 cm)
3" (7,6 cm)
Nails
Nail 2" nails fi rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Flush
2" (5,1 cm)
Screw
Fig. A
6" (15,2 cm)
Nails
6"
(15,2 cm)
2" (5,1 cm)
21
x2
2" (5,1 cm)
Fig. B
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
Nails
2" (5,1 cm)
Screw

Advertisement

loading

Related Products for Heartland VALUE Series