Copying And Pasting An Existing Scheduled Event; Copying And Pasting Scheduled Events For An Entire Day; Cutting And Pasting A Scheduled Event - Christie CineLife+ CP4415-RGB User Manual

Hide thumbs Also See for CineLife+ CP4415-RGB:
Table of Contents

Advertisement

2. In the calendar view, select the scheduled event.
3. Select Edit.
4. Edit the scheduled event settings.
5. Select Update Event.
Copying and pasting an existing scheduled
event
To run a scheduled event at a different date and time, copy and paste it.
1. In the left navigation menu, select Scheduler.
2. In the calendar view, select the scheduled event.
3. Select Copy.
4. Select a square below the date and next to the time that you want the event to run.
5. Select Paste.
6. Adjust the any settings for the scheduled event.
7. Select Paste Event.
Copying and pasting scheduled events for an
entire day
To run an existing full day of scheduled events on a different date, copy and paste the entire day of
scheduled events.
1. In the left navigation menu, select Scheduler.
2. At the top of the calendar, select the day with the events you want to copy.
3. Select Copy.
4. At the top of the calendar, select the new target day.
5. Select Paste.
Only unlocked events are copied to the new day.

Cutting and pasting a scheduled event

To move an existing scheduled event to a different date and time, cut and paste it.
1. In the left navigation menu, select Scheduler.
2. In the calendar view, select the scheduled event.
3. Select Cut.
4. Select the new date in the calendar.
5. Select Paste.
6. Adjust the settings for the scheduled event.
CineLife+ User Guide–CP4415-RGB, CP4420-RGB, CP4435-RGB, CP4440-RGB, CP4450-RGB, CP2420-Xe, CP4420-Xe
020-103073-06 Rev. 1 (03-2022)
Copyright
©
2022 Christie Digital Systems USA, Inc. All rights reserved.
Working with the scheduler