Spinnaker Halyard - Nacra 500 MK2 Assembly Manual

Table of Contents

Advertisement

8.3.

Spinnaker halyard

3mm
Bale line
Tape the ends of the bale line to slide easily through
the pre-drilled holes!
1.
Take the spin bale line and a carbo 29 mm T2 block.
2.
Feed one end of the spin bale line through the pre-drilled
holes in the mast and tie a figure 8 knot.
3.
Feed the other end of the spin bale line through the
middle of the 29mm block and feed it through the pre-
drilled holes and fixate it tightly with a figure 8 knot.
4.
Install the block line to the top of the block and the strap
eye above. Fixate the block at the same height as the bale
line is positioned.
52.
4mm
Bale up line
Spinnaker halyard
5.
6.
7.
5mm
Feed the spinnaker halyard through the starboard
spreaders.
Feed the spinnaker halyard from inside to outside
through the top block.
Attach the Dyneema line end of the spinnaker halyard
temporarily to the bottom of the mast.
1x

Advertisement

Table of Contents
loading

Table of Contents