Hoisting The Fully Battened Jib 500Mk2 - Nacra 500 MK2 Assembly Manual

Table of Contents

Advertisement

11.2.

Hoisting the fully battened jib 500MK2

1.
Connect the top of the jib to the shackle connected
to the stainles steel halyard.
2.
Detach the 3mm line from the shackle and hoist
the jib little by little. In the meanwhile twist the sail
hanks onto the forestay.
3.
Connect the stay adjuster to the tack of the sail using
a shackle or your jib cunningham system.
82.
4.
Hoist the jib fully .
5.
Thread the 4mm line through the mast mounted
camcleat's block. Thead the line back through
the block on the hoist line and cleat on the mast
mounted cleat.
6.
Detach the 3mm line and stow it away.

Advertisement

Table of Contents
loading

Table of Contents