Nacra 500 MK2 Assembly Manual page 63

Table of Contents

Advertisement

6.6.
Spinnaker furler
15mm
1.
Lay the continous furlingline out as shown in the
overview. make sure that the furler is facing upwards.
2.
Take the fairlead of the cleat using a T20 torx bit.
3.
Lay the inboard furling rope in the cleat and remount
the fairlead.
2x
shockcord
Parts: furler bottom with furling rope and rings, cleat with
mounting plate, shockcord furler cord
4.
Mount the cleat on starboard using the mounting plate.
Make sure the cleat is parallel to the front crossbar before
tightening the screws.
5.
Knot the shockcord for the furler rope to the ring on the
furler rope.
6.
Feed the other end of the shock cord through the
second-most aft eye in the hiking strap.
7.
Feed it through a lashing aft. And back to the eyelet on
the side of the trampoline.
8.
Knot this end to the other ringon the furling line.
9.
Temporarily stow the furler bottom away in the
trampoline bag.
63.

Advertisement

Table of Contents
loading

Table of Contents