Forestay Furling Jib - Nacra 500 MK2 Assembly Manual

Table of Contents

Advertisement

2.5.

Forestay furling jib

Tools needed:
- Self-amalgamating tape
If you own a furling jib instead of a hoisting jib install your
forestay as follows:
1.
Make sure the stainless steel jib halyard feeds through the top
block.
2.
Attach the 4mm line to one side of the stainless steel halyard.
3.
Connect the shackle to the other end of the stainless steel
halyard.
4.
Knot the 3mm line to the loose end of the 4mm line. This is
your hoisting mouse line.
5.
You can temporarily tie away the loose end of the 3mm line
to the shackle.
rigging kit furling jib
27.

Advertisement

Table of Contents
loading

Table of Contents