Nacra 500 MK2 Assembly Manual page 62

Table of Contents

Advertisement

6.4.
Spinnaker halyard cleat on mast
1.
Install the spinnaker cleat base on the mast.
With the long end pointing upwards.
2.
Install the 40mm carbo pivoting lead block.
The sheave should be on the top side. The
cleat is facing upwards.
3.
If the cleat is not facing down.
You can unmount the cleat
Turn it around
And remount the cleat.
2x
6.5.
Spinnaker sheet rings trampoline
1.
Tie a 15mm ring to one end of the shockcord.
2.
Feed the shockcord from above through the eyelet
located on the side of the trampoline.
3.
Pull the shockcord to the other side and feed it through
the eyelet from below.
4.
Attach a 15 mm ring to the end of the shockcord.
62.
15mm
2x
shockcord

Advertisement

Table of Contents
loading

Table of Contents