Quick Righting Line 500Mk2 - Nacra 500 MK2 Assembly Manual

Table of Contents

Advertisement

1.6.

Quick righting line 500mk2

20mm
2x
1.
Attach the shockcord with a bowline to the starboard
aft trampoline lashing under the trampoline.
2.
Feed the other end of the shockcord through the
20mm ring in the middle of the trampoline.
3.
Feed the line through the ring in the aft middle of the
trampoline.
4.
Attach the other ring to the end of the shock cord
using a bowline knot.
5.
Make an eight knot in the end of the righting line.
6.
Feed the other end through the ring under the front
cross beam.
8mm
righting line
5mm
shockcord
7.
Then through the ring attached to the shock cord.
8.
Back to the front cross beam, through the eyelet.
9.
Make an eight knot in the end of the righting line.
19.

Advertisement

Table of Contents
loading

Table of Contents