Forestay Full Battened Jib - Nacra 500 MK2 Assembly Manual

Table of Contents

Advertisement

2.4.

Forestay full battened jib

- 3mm allen key or T20 torx
- Self-amalgamating tape
If you a hoisting jib instead of a furling jib install your
forestay as follows:
1.
Assemble the forestay for the jib as shown in the images
below:
2.
Make sure the stainless steel jib halyard feeds through
the top block.
3.
Attach the 4mm line to one side of the stainless steel
halyard furthest from the forestay.
4.
Connect the shackle to the stainless steel halyard and
3mm line end.
5.
Attach the 3mm line to the other end of the 4mm line.
6.
Tape all sharp edges with self amalgamating tape.
26.
7.
Mount the forestay cleat on the mast.
8.
Attach the forestay adjuster to the bridle connector.
rigging kit standard jib

Advertisement

Table of Contents
loading

Table of Contents