1.
System will start 3 minutes countdown before it will
15
begin heating test.
1.
Screen will show the system in heating. Wait for the
16
compressor speed to reach more than 50%. Go to nearest
air outlet and observe if the air is warm. If yes, touch
to end the heating test.
1.
When the system test is successful, all test points will
17
be ticked. Touch 'Done' to exit. After all system test are
completed, touch "Finish Setup".
1.
System setup is completed. Display will show master
18
controller main screen.
26
Start
Cancel
Finish