Figure 17 AC Service Entrance for the Five-bay Cabinet

Use the appropriate minimum wire size (gauge), or larger,
for the maximum kilowatt rating of the charger. See section 3 for
the minimum fitted AC input wire size (AWG) per NEC.
The AC service entrance provides two-hole sizes.
Use the provided round panel to use the smaller hole
size, or remove this panel to use the larger hole size.
Place an appropriate cable gland or conduit clamp in
this AC service entrance hole to secure the cable
or conduit.
Connect the three-phase AC input power cables.
Ensure that ground and power cables have been
properly stripped (of approximately ½ in. [12.7 mm]
of insulation from the ends). Loosen the AC input
terminal screws, with a flathead screwdriver,
and insert the stripped ends of the ground and
power cables. (Figure 16 and Figure 17)
Retighten the screws with a minimum to maximum
torque of 22.2 in.-lb. (2.5 N-m) to 26.4 in.-lb. (3 N-m),
respectively. AC line input positions are
interchangeable because the three-phase input
is not phase specific.
Ensure that the cable gland or conduit clamp has been
properly tightened.