UPS5000-A-30 kVA, 40 kVA and 80 kVA
User Manual
Step 2 Install one reinforced beam on the front and at the rear of the rack, as shown in
Figure
Figure 3-37 Installing a reinforced beam (front view)
Step 3 Install four floating nuts on the front of each guide rail.
1.
Issue 13 (2022-01-19)
Figure 3-36 Securing a guide rail (front view)
3-37. Then tighten the panel screws.
Use a scale plate to determine the installation positions of floating nuts.
Figure 3-38
shows a scale plate.
NO TICE
Level the Bottom line on the scale plate with the bottom line of the U sale 01
on the rack. Install floating nuts onto the mounting holes for the mounting
bar that corresponds to Hole location lines.