Site Preparation

Safety Recommendations

To avoid possible bodily injury and equipment damage, carefully read the following publications before
installing your Aruba 6400 Switch:
Safety, Compliance, and Warranty Information (shipped with the switch)
n
START HERE: Installation, Safety, and Regulatory Information for the Aruba 6400 Switches and Accessories
n
(shipped with the switch)
START HERE: Installation, Safety, and Regulatory Information for the Aruba 6400 Power Supply Units (shipped
n
with the switch and with PSUs)
All safety recommendations in this chapter
n
The chapter titled
n
The recommendations in the listed publications do not cover every possible hazardous condition.
Electricity Safety
Clear the work area of possible electricity hazards, such as ungrounded power extension cables, missing
n
safety grounds, and wet surfaces or wet floors.
Locate the emergency power-off switch in the room before installation so you can quickly shut power off if
n
an electrical accident occurs.
Remove all external cables, including power cords, before moving the chassis.
n
Do not work alone when the switch has power.
n
Handling Safety
Do not use the handle of a fan tray or a power supply unit, bezel, module locking or extraction levers, or the
chassis air vents to lift or move the switch. Any attempt to move the switch with these parts may cause
equipment damage and bodily injury.
When you move the switch, follow these guidelines:
Remove all power supplies, line and management modules, fan trays, and all external cables, including the
n
power cords, before moving the chassis.
Use a minimum of four people to manually move a chassis weighing more than 100 lbs, and a minimum of
n
two people to manually move a chassis weighing less than 100 lbs. To determine chassis weight, see
6400 product
weights.
Aruba recommends using a mechanical lift to move the chassis.
Lift and lower the chassis slowly. Never move it suddenly.
n
For information and recommended practices for moving the chassis, see
chassis.
Aruba 6400 Switch | Getting Started Guide
Installation precautions and
guidelines.
Unpacking, lifting, and moving the
Chapter 3
Site Preparation