4. General Description The D10 is a heavy duty sliding gate operator designed to open and close sliding gates. The D10 Turbo is perfectly suited for sites with lighter gates requiring a high number of operations per day and very fast opening and closing speeds, and can reach almost double the speed of the standard D10.
Make H>h to ensure gate will not jump over endstop as shown above Since the D10 Turbo operates at exceptionally high speeds, it is mandatory to install the following additional safety equipment in order to ensure the safest possible installation: ...
It is more convenient to introduce oil before bolting the unit down, as shown in the illustration below. The D10/ D10 Turbo does not require routine oil changes. However, in the event of the unit losing oil due to stripping down or...
Ped: Optional Pedestrian Keyswitch (a) or keypad (3 core 0.5mm ) Trg: Optional external radio receiver (3 core 0.5mm ) Light: Optional Pillar Lights (3 core LNE SWA, size according to power requirements) n1 = number of cores required by intercom n2 = number of cores required by intercom Possibly increase cable thickness if pillar lights are installed Type of cable must adhere to municipal bylaws but typically SWA...
Guide-rollers and anti-lift brackets are correctly fitted The gate mass, starting- and rated-pull-force limitations are not exceeded The D10/D10 Turbo is positioned correctly and does not protrude into the driveway Locate operator position To ensure operator does not...
Page 7
Route cables and secure foundation plate Route cables as determined in Section 9: Cabling requirements. 500mm The cable conduits or Cable SWA cable glands should termination mounting terminate onto the cable flange bolts termination flange provided in the foundation plate, as depicted in the illustration Make sure that all cables protrude at least 500mm...
Page 8
Mounting the Isometric view origin marker Close the gate completely. Mount the origin marker to the rack a minimum of 500mm from the origin sensor. Greater than 500mm Bolt using fasteners provided For steel rack, mount the origin marker onto the rack using the bracket provided.
Check the ‘Mains Present’ icon on the main diagnostic screen or switch to the battery charger diagnostic screen and check the charger voltage – right-hand value. This should indicate, 27.6V for the D10 and D10 Turbo. Each charger has a red light (LED) to indicate mains supply.
Page 10
Centurion Systems (Pty) Ltd does not accept any liability caused by improper use, of the product, or for use other than that for which the automated system was designed.
Page 11
Sharecall 0860-CENTURION (0860 236 887) Head Office: +27 11 699 2400 Sharecall Technical Support 0861 003 123 or +27 11 699 2481 from 07h00 to 18h00 (GMT+2) (Sharecall numbers applicable when dialed from within South Africa only) 0.07.A.0047_18032014 www.CentSys.com...
Need help?
Do you have a question about the D10 and is the answer not in the manual?
Questions and answers