Mounting The 4700 In A Rack (Standard Installation) - Mellanox Technologies Grid Director 4700 Installation Manual

Table of Contents

Advertisement

3. Go back and tighten the screws that were used to connect the two parts of the rail in Step 1.
IMPORTANT: If you do not tighten the screws, the chassis cannot be mounted safely in
the rack.
4. Repeat steps 1 to 3 to assemble the other rail and mount it on the other side of the chassis;
the rails are now ready for chassis installation.
IMPORTANT: Ensure box-to-box vertical alignment in all four connections. See that the
bottom side of the rail is aligned with the 1U marking on the rack rail.
6.3

Mounting the 4700 in a Rack (Standard Installation)

This section provides instructions on how to mount the 4700 in a rack.
Prerequisites:
Rail kit
19" bracket attached to the chassis
To install the 4700 chassis:
1. Lift the chassis using a hydraulic chassis lift (or another adequate tool) and place it on the
rails, with front of the chassis towards you, as shown in the figure below.
2. Slide the chassis into place. Note: At least two people are required to perform this
operation.
3. Secure the chassis onto the rack by aligning the holes in the front of the chassis with the
mounting holes in the equipment rack's vertical front rail.
60
Screws and clip nuts to connect the chassis to the rack and rail kit to rack are not supplied
by Mellanox.
Make sure that the grounding stud is installed before performing the steps below (see
Chassis Grounding
(on page 48)).
Rack-Mounting the 4700 Chassis