Packing And Unpacking; Package Contents - Mellanox Technologies Grid Director 4700 Installation Manual

Table of Contents

Advertisement

4

Packing and Unpacking

This chapter provides step-by-step instructions for packing and unpacking the Grid Director
4700 chassis.
4.1

Package Contents

The Grid Director 4700 is supplied in a heavy duty tri-wall cardboard box secured with
packing straps.
For information about the various 4700 configurations and items shipped with the chassis,
refer to
Chapter 1
The basic 4700 shipping contents are as follows:
Grid Director 4700
Horizontal fan unit (sFU-40H)
Vertical fan unit (sFU-40V)
Management board (sMB-CM)
Two power supply units (sPSU-S).
The Grid Director 4700 chassis is shipped with a horizontal fan unit (sFU-40H) and a vertical
fan unit (sFU-40V) installed at the front of the chassis and two power supplies at the rear of the
chassis.
Additional components include:
Rail kit for rack installation
Cabling guide brackets
One power cord per power supply
One console cable
A grounding kit
Mellanox Getting Started Short Guide
Two product CDs (one containing the software, one containing the documentation).
Verify that the package contains the items detailed in the packing list before you begin to
install the Grid Director 4700.
Check for loose parts or any visible damage to the contents. If any damaged or missing parts
are detected, notify your local Mellanox representative.
42
(on page 18).
Packing and Unpacking

Advertisement

Table of Contents
loading

Table of Contents