Mellanox Technologies Grid Director 4700 Installation Manual page 51

Table of Contents

Advertisement

Mellanox Grid Director 4700 Installation Manual
To install the Grounding Stud:
1. Insert a 10-32 5/8" screw through the Grounding hole, rear-to-front, as shown.
2. Add a spring washer onto the 10-32 5/8" thread, this time front-to rear.
3. Add a nut #10.
4. Add another spring washer.
5. Insert the 6 AWG grounding cable. Connect the other end of the grounding cable to a
grounding point at your site.
6. Add another spring washer. Make sure that the grounding cable is tightly secured between
the two spring washers.
7. Secure everything with a grounding nut #10.
8. Apply the Ground label under the grounding nut.
9. Apply the Safety Warning label on the side of the chassis, near the grounding stud.
51

Advertisement

Table of Contents
loading

Table of Contents