Rail Kit Assembly Procedure - Mellanox Technologies Grid Director 4700 Installation Manual

Table of Contents

Advertisement

Mellanox Grid Director 4700 Installation Manual
7. Attach the front side of the rail to the rack's front vertical side rail with 2 screws for each
side and the rear side of the rail to the rack's rear vertical side rail with 2 screws for each
side.
IMPORTANT: If you do not tighten the screws, the chassis cannot be mounted safely in
the rack.
8. Repeat steps 1 to 3 to assemble the other rail and mount it on the other side of the chassis;
the rails are now ready for chassis installation.
IMPORTANT: When mounting the rail ensure box-to-box vertical alignment on all four
rack rails. See that the bottom side of the rail is aligned with the 1U marking on the rack
rail.
6.2.3

Rail Kit Assembly Procedure

This section presents the procedure for assembling and mounting the rail kit. Each step is
accompanied by a figure, showing the components as they appear aligned and then assembled
one by one.
In addition, eight screw sets are included, comprising one screw, one nut, and two washers.
To assemble the rail:
1. Use 8-32 5/8" screws and flat washers and spring provided with the kit to assemble the rail,
positioning the insert in front of the bracket as shown below.
1. For each of left and right, take a bracket and attach an insert (the two inserts are
identical). At this stage, position the two parts to fit the distance between the rack rails
of each side.
Make sure that you are using the right bracket for the right rail (right side when
facing the front of the rack) and the left bracket for the left rail (left side when facing
the front of the rack). The insert is identical for both rails.
57

Advertisement

Table of Contents
loading

Table of Contents