Automation Dr. Nix QNix 9500 Operation Manual page 18

Hide thumbs Also See for QNix 9500:
Table of Contents

Advertisement

QNix
9500
®
The gauge is now ready for use. To remove a probe, follow the above steps in reverse order.
3.3. Check Basic Settings
Check and, if necessary, change the factory settings of your device. At a minimum, check the settings for
language
unit
date and time
configuration of the
power save options
These settings can be found in the „System" menu. The settings pertaining to the measurement job can
be found in the menu „Jobs", „Limits" and „Adjustment".
3.4. Software Backup
The „QN9" is loaded on the device. This software is used to later manage the device and the recorded
measurements on the PC. Back this software up to your PC.
Notice
Formatting will erase all data
Formatting the memory will also erase the software from the device. You can download the software
from www.q­nix.com/download.
18
Probe cable
Probe
Probe holder
Q
button

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QNix 9500 and is the answer not in the manual?

Table of Contents