Step1: Determine the installation location and heat-dissipation space.
The inverter/charger requires at least 20cm of clearance right
and left and 50cm of clearance above and below.
Step2: According to the installation position marked with the mounting plate 1, drill two M10 holes with an
electric drill.
Step3: Insert the screws of the M8 bolts and the steel pipes into the two M10 holes.
Step4: Install the inverter/charger and determine the installation position of the M10 hole (located at the
bottom of the inverter/charge).
Step5: Remove the inverter/charger and drill an M10 hole according to the position determined in step4.
Step6: Insert the screw of the M8 bolt and the steel pipe into the M10 hole.
Step7: Install the inverter/charger and secure the nuts with a sleeve.

2.5 Wiring

1)
Remove the terminal cover
Remove covers of the AC output /AC input/utility input terminal with a screwdriver, as shown below: