Scenario C: Both PV and utility are available.
Input:
(C-1)
PV
Utility
Input:
(C-2)
PV
Utility
Input:
(C-3)
PV
Utility
Solar only
Solar only
Solar Priority
Output:
❶
When P
PV
battery and supplies extra power to the
load.
❷
≤ P
When P
PV
the battery. Instead, it supplies the load
together with the battery.
❸
When V
Battery
supplies the load, and PV charges the
battery.
Output:
Utility supplies the load, and PV charges
the battery.
Output:
❶
When P
PV
battery and supplies extra power to the
load.
❷
When P
PV
the battery. Instead, it supplies the load
together with the battery.
28
Inverter Priority
> P
, PV charges the
Load
, PV stops charging
Load
≤ V
, the utility
LVD
Utility Priority
Inverter Priority
> P
, PV charges the
Load
≤ P
, PV stops charging
Load