Step 5 Initialize parameters according to local grid requirements, including grid type, reactive
power regulation mode, etc. The screen displays that the inverter is successfully
configured.
- - - - E E n n d d

6.6 Configuring the Plant

The inverter is successfully added to the plant and initialized. Refer to the guidance in
previous sections.
The distributor/installer who creates a plant for the end user needs to get the end user's
e-mail address. In configuring a plant, the e-mail address is required, and each e-mail
address can be registered only once.
Step 1 The App screen will display the added inverter. Tap N N E E X X T T to configure the plant.
G G r r i i d d T T y y p p e e
• UE-ST-2008.1: ≤ 10 kVA for single-
phase & 30 kVA for three-phase
• UE-ST-2008.2: > 30 kVA three-
phase
AS/NZS 4777.2:2015
• TS129-2019: < 10 kW for single-
phase & 30 kW for three-phase
• TS130-2017: > 30 kW & ≤ 200 kW
• TS131-2018: > 200 kW
F F i i g g u u r r e e 6 6 - - 1 1 0 0 Initializing Parameters