Network Service Provider
United Energy
PowerWater
SA Power Networks
Horizon Power
westernpower
AusNet Services
* For compliance with AS/NZS 4777.2:2020, please select from Australia A/B/C. Please con-
tact your electricity grid operator for which region to use.
step 5 Initialize parameters according to local grid requirements, including grid type, reactive power
regulation mode, etc. The screen displays that the inverter is successfully configured.
- - End
6.6

Configuring the Plant

The inverter is successfully added to the plant and initialized. Refer to the guidance in pre-
vious sections.
Grid Type
UE-ST-2008.1: ≤ 10 kVA for single-
phase & 30 kVA for three-phase
UE-ST-2008.2: > 30 kVA three-phase
Embedded Generation Notice Photovoltaic
Systems:2020
TS129-2019: < 10 kW for single-phase
& 30 kW for three-phase
TS130-2017: > 30 kW & ≤ 200 kW
TS131-2018: > 200 kW
HPC-9DJ-13-0001-2019: ≤ 10kVA for
single-phase & 30 kVA for three-phase
HPC-9DJ-13-0002-2019: > 30kVA &
≤1MVA
EDM#33612889-2019
Basic Micro Embedded Generation: 2020
figure 6-5 Initializing Parameters