Mechanical Mounting; Safety During Mounting; Location Requirements; Environment Requirements - Sungrow SG2.0RS-S User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG2.0RS-S:
Table of Contents

Advertisement

Mechanical Mounting

4

4.1 Safety during Mounting

Make sure there is no electrical connection before installation.
In order to avoid electric shock or other injury, make sure that holes will not be
drilled over any electricity or plumbing installations.
Risk of injury due to improper handling
• Always follow the instructions when moving and positioning the inverter.
• Improper operation may cause injuries or serious wounds.
In the case of poor ventilation, the system performance may compromise.
• Keep the heat sinks uncovered to ensure heat dissipation performance.

4.2 Location Requirements

Select an optimal mounting location for safe operation, long service life and expected
performance.
• The inverter with protection rating IP65 can be installed both indoors and outdoors.
• Install the inverter at a place convenient for electrical connection, operation, and
maintenance.

4.2.1 Environment Requirements

• The installation environment must be free of inflammable or explosive materials.
• The location should be not accessible to children.
13

Advertisement

Table of Contents
loading

Table of Contents