Clearance Requirements; Installation Tools - Sungrow SG2.0RS-S User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG2.0RS-S:
Table of Contents

Advertisement

User Manual

4.2.4 Clearance Requirements

Reserve enough clearance around the inverter to ensure sufficient space for heat
dissipation.
Install the inverter at an appropriate height for ease of viewing the screen and LED
indicator and operating switch(es).

4.3 Installation Tools

Installation tools include but are not limited to the following recommended ones. If
necessary, use other auxiliary tools on site.
4 Mechanical Mounting
15

Advertisement

Table of Contents
loading

Table of Contents