User Manual
(1) Heat shrink tubing
Step 2 Remove the screw on the grounding terminal and fasten the cable with a screwdriver.
Step 3 Apply paint to the grounding terminal to ensure corrosion resistance.
- - - - E E n n d d

5.5 AC Cable Connection

5.5.1 AC Side Requirements

Connect the inverter to the grid only after getting an approval from the local
electric power company.
5 Electrical Connection
(2) OT/DT terminal