Powering Up The Tail Lift - Zepro ZT MK2 Installation Instructions Manual

Tail lift
Hide thumbs Also See for ZT MK2:
Table of Contents

Advertisement

Powering up the tail lift

7
Powering up the tail lift
1. Make sure that the main power switch is in the "OFF" position.
2. Connect the cable (1) between the battery's positive terminal and the connection point and place the
fuse (2) above, see Picture 53.
3. Connect the main power cable (3) to the connection point, see Picture 53.
4. Screw the cable connections and fuse into place using the knob (4). Install the cables at 90° or 180° from
each other. Install the fuse at right angles to the cables, see Picture 53.
!
IMPORTANT
The knob must lie against and centre the cable clip so that it does not come into contact with the bolt.
Incorrect installation can cause the fuse to be ineffective. Risk of fire in the event of a short circuit.
5. Install the fuse box cover.
6. Set the main power switch in the "ON" position.
Picture 54. Correct installation
38
4
3
2
1
Picture 53. Place fuse
and connect cabling
Picture 55. Incorrect installation
ZT MK2
Picture 56. Cover, fuse box
www.zepro.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zt 200 mk2Zt 250 mk2

Table of Contents