Zepro ZT MK2 Installation Instructions Manual page 37

Tail lift
Hide thumbs Also See for ZT MK2:
Table of Contents

Advertisement

Connection of controller and warning lights
ZT MK2
1. Release and fold out the control card.
2. Run the cabling through the grommet.
3. Connect the appropriate controllers and, where applicable, the warning lights.
4. Run the cabling on the reverse of the control card and secure with cable ties.
5. Fold in and secure the control card.
!
IMPORTANT
Ensure that no cables are trapped or in any other way damaged when the control card is folded out/in.
Picture 52. Installing cabling with cable ties
www.zepro.com
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zt 200 mk2Zt 250 mk2

Table of Contents