99
ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV. J
Preparing the cables for cable entries with sealing
—
References
modules
—
6-6 Preparing power
•
Prepare cables with an outer cable screen or
cables for sealing
shield
modules
sure of the cabinet
•
Install the sealing modules according to the
instructions of the sealing module supplier.
2
3
11
—
6-6
for EMC bonding with the metal enclo-
as
illustrated.
1
4
6
8
7
9
10
5
Outer cable sheath
1
Sealing module
2
Frame
3
Conductive foil of sealing module
4
Cable sheath removed to expose cable shield
5
Cable clamp
6
Shrinkable sheath seal
7
Shield extension to be connected to PG busbar
8
Conductor screen extension to be connected to
9
the PG busbar
Heat-shrinkable termination
10
Cable lug as specified by the cable supplier and
11
suitable for M12 bolt