ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV. J
Preparing cables for cable entries with sealing
References
modules
1. Unscrew the frame and remove the sealing
6-11 Preparing control
cables for sealing
modules.
modules
6-12 Preparing control
cables for cable glands
2.
Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet
1
2
3
6-11
1
2
6-12
For information on removing and install-
ing the sealing modules, see Appendix A –
Additonal manuals.
as illustrated.
Sealing module
1
Conductive foil
2
Cable sheath removed to expose cable shield
3
Conductor screen extension to be connected to PE terminal
4
4
3
4
5
Preparing cables for cable entries with cable
glands
Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet
Outer cable sheath
1
Cable gland
2
Conductor insulation removed to expose cable shield
3
Plate
4
Conductor screen extension to be connected to PE terminal
5
as
illustrated.