Christie Roadie HD+35K Setup Manual page 13

Hide thumbs Also See for Roadie HD+35K:
Table of Contents

Advertisement

Ballast to AC
Refer to
Figure
Before connecting the ballast to the AC, a Christie accredited service technician must ensure the ballast's
NOTE:
plug type and Input Power Range Switch matches the line voltage available at the site. Remove the Ballast
cover to access the breaker/power switch and determine it's setting. Toggle LEFT for 200 VAC supplies
and RIGHT for 400 VAC supplies (factory default=200 VAC). Change the Ballast's plug type as necessary,
as a delta load with safety ground has no neutral.
• Connect the ballast's integral three-phase 30-amp line cord to AC according to your site.
• Confirm the ballast's three-phase status lights are ON and the adjacent voltmeter displays an acceptable
AC level for your ballast, and region. Refer to
• Set the breaker/power switch to ON. Listen for the internal cooling fan to start-up.
Roadie HD+35K Setup Guide
020-100394-02 Rev. 1 (01-2010)
Figure 2-3 Connect Head to Ballast
2-4.
Projector Rear
Section 5 Specifications
Section 2: Installation and Setup
for details.
2-3

Advertisement

Table of Contents
loading

Table of Contents