Extreme Networks BlackDiamond 8810 Hardware Installation Manual page 111

Extreme blackdiamond 8810: installation guide
Hide thumbs Also See for BlackDiamond 8810:
Table of Contents

Advertisement

4 Slide the Aspen shipping carton up over the chassis.
5 Remove all four restraining bolts that hold the chassis to the wood pallet as shown in
Figure 54: Restraining bolts holding the Aspen chassis onto the wood pallet
Remove 4 bolts
6 Using each person, place one hand in the empty power supply bay and the other hand in the rear
slot on the back panel of the chassis.
WARNING!
Correct lifting procedures for the chassis requires 2 or more people.
WARNING!
The chassis should be empty to prevent added weight prior to lifting. This will also prevent damage to the system
components due to possible chassis flex when lifting.
7 Gently lift the chassis off from the wood pallet onto the floor as shown in
Figure 55: Correct method for lifting the Aspen chassis
Extreme Networks Consolidated XOS Hardware Installation Guide
Lift box
off
chassis
holding chassis
to pallet
Uncrating and Unpacking the Aspen 8810 Chassis
ASP016B
Figure
ASP017A
Figure
54.
55.
111

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents