Pre-Delivery Customer Checklist - Schulte SRW1400 Operator's Manual

Pivoting rock windrower
Table of Contents

Advertisement

PRE-DELIVERY CUSTOMER CHECKLIST

Is oil level in the gearboxes to correct level?
Has the proper oil been used in the Gearboxes?
Are the Tires clear of the Mainframe, even when turning during axle articulation?
Are all hoses tight and do not leak?
Are all decals in place? See manual for decal description and placement.
Are all bolts tight?
Have all hoses been properly routed so that hoses do not kink or bind when windrower is articulated
through all motions?
Is machine equipped with proper operator protection?
Is drum rotation correct? Are teeth hard surfaced?
Does implement operate smoothly at normal operating speed? Implement should not vibrate excessively.
SRW1400 08/16
© 2016 Alamo Group Inc.
ASSEMBLY
Assembly Section 3-7

Advertisement

Table of Contents
loading

Table of Contents