Light Kit; Installation Of Left Light Bar; Installation Of The Right Light Bar; Installation Of Lights - Schulte SRW1400 Operator's Manual

Pivoting rock windrower
Table of Contents

Advertisement

Light Kit

The pivoting action of the SRW 1400 enables the implement to decrease its transport width to under 3 metres,
thereby eliminating the need for additional lighting for width. However, should the implement be used for
reclaiming gravel from roadsides, a light kit is required.

Installation of Left Light Bar

1 . The left light bar is the shorter of the two.
2 . Locate the light bar as shown in Figure Asm-
W-0010.
3 . Place a backing plate on opposite side of tube
from light bar.
4 . Insert the 3/8" x 3" bolts provided through
backing plate and light bar. Secure with 3/8"
locknuts provided.

Installation of the Right Light Bar

1. Locate the light bar as shown in Figure Asm-
W-0011. The light bar should be positioned as
close to the back of the machine as possible.
2. Place backing plate on opposite side of tube
from light bar.
3. Insert the 3/8" x 3" bolts provided through back-
ing plate and light bar. Secure with 3/8" lock-
nuts provided.

Installation of Lights

1. Install the lights onto the light bars using 5/16" hardware provided. Ensure that the red lights are inside and
facing to the rear as shown in Figures Asm-W-0010 and Asm-W-0011.
SRW1400 08/16
© 2016 Alamo Group Inc.
ASSEMBLY
Assembly Section 3-5

Advertisement

Table of Contents
loading

Table of Contents