Pre-Operation Inspection And Service - Schulte SRW800 Operator’s Manual With Parts Listing

Rock windrower
Table of Contents

Advertisement

WARNING!
Before operating the Implement, check to make sure the Implement input
driveline will not bottom out or become disengaged. Bottoming out occurs
when the inner shaft penetrates the outer housing until the assembly
becomes solid-it can shorten no more. Bottoming out can cause serious
damage to the Tractor PTO by pushing the PTO into the Tractor and
through the support bearings or downward onto the PTO shaft, breaking
it off. A broken drive line can cause personal injury.

8. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the windrower and tractor must be performed. This
includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and
functional, and performing needed repairs. Do not operate the windrower and tractor if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as
soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair
cost can be avoided.
DANGER!
Always disconnect the main PTO Driveline from the Tractor before
performing service on the implement. Never work on the implement with
the tractor PTO driveline connected and running. Teeth or Drivelines could
turn without warning and cause immediate entanglement, injury or death.
(SRM-3)
DANGER!
Never work under the Implement, the framework, or any lifted component
unless the Implement is securely supported or blocked up to prevent
sudden or inadvertent falling which could cause serious injury or even
death.
(SG-14)
WARNING!
Periodically inspect all moving parts for wear and replace when neces-
sary with authorized service parts. Look for loose fasteners, worn or
broken parts, and leaking or loose fittings. Make sure all pins have cotter
pins and washers. Serious injury may occur from not maintaining this
Implement in good working order.
SRW800 07/03
© 2003 Alamo Group Inc.
OPERATION
(SG-21)
Operation Section 4-15
(S3PT-18)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents