IN120 / IN220 Exit Device
4 Installing the Controller (Continued)
1. Insert bottom tab of controller (ensure a clear path) into slot on mounting plate (Fig. 4D, E).
2. Ensure proper alignment of board-to-board connectors (Fig. 4E) while pivoting controller toward door
until two tabs on top snap securely into place on mounting plate (Fig. 4D).
CAUTION: To avoid possible damage to board-to-board connectors, care should be taken when securing
controller to mounting plate. If there is resistance when securing, detach controller to determine
cause before re-attaching controller.
5 Supplying Power to the Controller
Important - before inserting PoE plug into PoE connector, apply dielectric grease to top
of plug, covering the pin area (Fig. 5A).
A. IN220 (PoE)
1. Once controller is securely in place, connect RJ45 male
connector to female RJ45 port on controller board (Fig. 5A).
2. If power is enabled, LED will flash and lock motor will cycle.
1-800-810-WIRE • www.sargentlock.com • A8185D
Fig. 4D
Apply grease
29
Click
into
place
Fig. 4E
Fig. 5A