First Startup Of The Base Unit - Barco CX-20 Installation Manual

Hide thumbs Also See for CX-20:
Table of Contents

Advertisement

2.
Slide a power input adaptor piece (US, AU, IN, CH, EU or UK) on the power adapter of the ClickShare until
it clicks. Use the one
which is applicable in your country.
Image 4–9 Power adapter
3.
Connect the power cable to the wall outlet.

4.15 First startup of the Base Unit

Workflow
1.
First time boot of the Base Unit.
The following screen is seen on the connected monitor.
Image 4–10 Onboarding screen
There are now 2 ways to continue:
1. Check for updates (optional), configure your Base Unit and register to XMS Cloud. See
to start up", page 40
2. Plug in a button and start sharing your screen. See
"Start up without configuration", page 45
CX-20 Installation
"Preferred way
R5900102 /04
CX-20
39

Advertisement

Table of Contents
loading

Table of Contents