First Setup Of The Base Unit - Barco CX-50 Installation Manual

Hide thumbs Also See for CX-50:
Table of Contents

Advertisement

CX-50 Installation

4.13 First setup of the Base Unit

After the physical installation is done, start with the first setup procedure to activate and configure
your device.
Preferred workflow
1.
Plug in the power supply and HDMI cable.
The Base Unit starts up.
Image 4-7
2.
Plug in a network cable.
The system checks for updates.
Image 4-8
If an update is available, the base unit will download, update and reboot
if no update is available, the unit will continue to the next step
3.
Start registration to XMS cloud.
40
R5900096 /00
CX-50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-20

Table of Contents