Considerations Prior to Installation
Considerations Prior to Installation
When installing the switch, note the following:
•
Before starting the installation procedure, notify the network administrator of the
installation.
•
Follow the installation procedures in the order as presented in this guide.
•
Do not connect the switch to the network until you have established the correct IP
address.
Required Tools
A Phillips screwdriver is required to install the switch into a rack.
Unpacking the Switch
Unpack the switch as follows:
1.
Open the box and remove the packing material protecting the switch.
2.
Verify that the contents of the carton contains the items listed in Table
Table 3-3 Contents of Switch Carton
Item
B2G124-48P
Rack mounting bracket
M3x6-mm flathead screws
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country-dependent.)
This installation guide
Customer Release Notes
URL notice card
3.
Remove the tape seal on the non‐conductive bag to remove the switch.
4.
Perform a visual inspection of the switch for any signs of physical damage. Contact
Enterasys Networks if there are any signs of damage. Refer to "Getting Help" on
page 1‐8 for details.
3-2 Hardware Installation