Average Task Duration - Fujitsu PRIMERGY RX2450 M1 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Please ask your local Fujitsu service center for more information.
2.3

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
Server shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly, rack
installation
RX2450 M1
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance, see
maintenance task" on page
Making the server available, removing the
yes
server from the rack (if applicable).
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks.
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Reassembling the server, installing the
yes
server in the rack (if applicable).
Upgrade and Maintenance Manual
Before you start
"Starting the
67.
21

Advertisement

Table of Contents
loading

Table of Contents